Large-Base Machining Scope
Each catalog reference carries its selected scope into the quotation form. Finished dimensions, material records and acceptance follow the approved order.
Large-Base Machining Scope
Drawing-specific machining of large plate stacks and base features, with footprint, weight and machining access reviewed before quotation.
- Supply scope
- Plate/feature machining
- Interface review
- Provide footprint, overall height, plate stack and approximate set weight. Identify machining access, handling needs, critical features and inspection datums. Confirm materials, remaining assembly, required reports and the delivery plan before production.
- Overall capacity
- Footprint up to 1500×1200 mm; approximately 8 tonnes per set, subject to drawing review
Provide footprint, overall height, plate stack and approximate set weight. Identify machining access, handling needs, critical features and inspection datums. Confirm materials, remaining assembly, required reports and the delivery plan before production.
Request this optionGuide assembly refers to the agreed guide pillar and bushing work. Hot runner systems, hydraulic cylinders, rotation hardware and other purchased mechanisms are not automatically included.
Drawing and Quotation Checklist
- Provide footprint, overall height, plate stack and approximate set weight.
- Identify machining access, handling needs, critical features and inspection datums.
- Confirm materials, remaining assembly, required reports and the delivery plan before production.
Include quantity, drawing revision, required inspection documents and delivery destination. Single-piece and small-batch inquiries are accepted.
Prepare a mold base inquiryInspection and Production Planning
Dimensional and CMM reports are available for agreed features. Published capacity is up to 1500×1200 mm footprint and approximately 8 tonnes per set, subject to actual geometry, height, machining access and handling review.
Production schedule: 15–25 working days for large/complex projects. Working days exclude weekends and statutory public holidays in China. The clock starts on the next working day after formal PO receipt, final drawing/specification approval and applicable deposit receipt are all completed. Transport time is separate.



